1 |
MT-1 Project, Construction of SM/AN Tanks |
1992 |
TP Company |
Prai, Penang |
Design, Fabrication and Construction of 6500 m³ and 3500 m³ Special Dome Roof Tanks |
2 |
MT-2 Project, Construction of BD Tanks |
1993 |
TP Company |
Prai, Penang |
Design and Construction of 2 x 1800 m³ Spherical Tanks |
3 |
MT-3 Project, Construction of AN/SM/BD Tanks |
1995/1996 |
TP Company |
Prai, Penang |
Design, Construct of Feed Stock Storage Tanks for ABS Factory |
4 |
Silo |
1996 |
BPC Company |
Kuantan |
Design, Fabrication and Construct of Silos |
5 |
Waste Sludge Incinerator Plant |
1996 |
BPC Company |
Kuantan |
Design, Procurement, Fabricate, Construct and Commissioning of Waste Sludge Incinerator |
6 |
Waste Heat Recovery Project |
1997 |
TP Company |
Prai, Penang |
Procurement, Fabrication, Erection and Commissioning of Solid Waste Incinerator |
7 |
4000 TCD Sugar Factory |
1998 |
Lamson Sugar Company |
Hanoi. Vietnam |
Design, Procurement, Fabrication and Delivery of 12 sets of a total of 219.7 m length of Sugar Belt Conveyor |
8 |
No.2 Waste Heat Recovery Project |
2003/2004 |
TP Company |
Prai, Penang |
Procurement, Fabrication, Erection and Commissioning of Solid Waste Incinerator |
9 |
Construct of Gas Holder for Sewage Treatment Plant |
2005/2006 |
HPCW Company |
Kuala Lumpur |
Design, Pprocurement, Fabrication, Erection and Commissioning of 2 x 2500 m³ Dry Seal Gas Holder |
10 |
Replacement of Quencher |
2006 |
PetroChemical Singapore Ltd. |
Singapore |
Design, Fabricate, Erect of new quencher replacement for existing incinerator plant |
11 |
YANSAB Project (Thermal Oxidizer) |
2007 |
Tsukishima Kankyo Engineering Ltd. |
Kuala Lumpur |
Fabrication of Thermal Oxidizer, Scrubber, Quencher & Stack |
12 |
Refractory Replacement |
2007 |
MTBE (M) S/B |
Kuantan |
Replacement of refractory for the entire furnace unit |
13 |
Replacement of Downcomer and Accessories in Incineration Plant |
2008 |
Vinyl Chloride (M) S/B |
Kerteh, Terengganu |
Replacement of graphite downcomer tube, expansion joint and stuffing box for existing incinerator plant |
14 |
Improvement of Existiing Plant Performance by replacing of Major Equipment on HCL Recovery Incineration Plant |
2010/2011 |
Vinyl Chloride (M) S/B |
Kerteh, Terengganu |
New design and fabrication of burner unit, furnace, waste heat boiler, downcomer and etc. |
15 |
Construction of Spherical Tank for Raw Chemical Gas Storage |
2011/2012 |
TP Company |
Prai, Penang |
Design, Procurement, Fabrication, Erection and Commissioning of 4,000 m³ Pressurized Spherical Tank |
16 |
Hazardous Waste Incineration Plant |
2012/2014 |
Sarawak Waste Management S/B |
Kuching, Sarawak |
Design, Procurement, Fabricate, Erection and Commissioning of 60 ton / day Gasification Kiln Type Hazardous Waste Incineration Plant |
17 |
Food Factory |
2013/2014 |
AD Company |
Tg. Langsat, Johor |
Design, Procurement, Fabricate, Erection and commissioning of Margarine Sweetening Manufacturing Factory |
18 |
Chemical Factory |
2015/2016 |
TS Company |
Kemaman, Terengganu |
Design, Procurement, Fabricate, Erection and Commissioning of High Quality Zeolite Manufacturing Factory |
19 |
Pressure Vessel for Filter |
2015/2016 |
RP Chemicals (M) |
Kuantan, Pahang |
Procurement and Fabrication of Pressure Vessel for BOKELA Rotary Pressure Filter |
20 |
Waste Water Treatment Plant |
2017/2018 |
D Company |
Prai, Penang |
Design, Procurement, Fabricate, Erection and Commissioning of WWT Plant in Chemical Factory |
21 |
Refractory Replacement work |
2018 |
K Company |
Kuantan, Pahang |
Replacement of refractory for Combustor and Quencher, start up commissioning for the Incinerator |
22 |
Refracory Maintenance work |
2019 |
K Company |
Kuantan, Pahang |
Repair on refractory for Combustor and start up commissioning for the Incinerator |
23 |
Incinerator Project, Indonesia |
2019/2020 |
Tsukishima Kankyo Engineering Ltd. |
Indonesia |
Design, Procurement and Fabrication of Incinerator Pressure Vessel, Tanks and Heat Exchanger |
24 |
2 Storey Warehouse Extension |
2020 |
G Company |
Bukit Mertajam, Penang |
Design, Procurement, Erection and project management of 2 Storey Warehouse extension to existing factory |