1 MT-1 Project, Construction of SM/AN Tanks 1992 TP Company Prai, Penang Design, Fabrication and Construction of 6500 m³ and 3500 m³ Special Dome Roof Tanks
2 MT-2 Project, Construction of BD Tanks 1993 TP Company Prai, Penang Design and Construction of 2 x 1800 m³ Spherical Tanks
3 MT-3 Project, Construction of AN/SM/BD Tanks 1995/1996 TP Company Prai, Penang Design, Construct of Feed Stock Storage Tanks for ABS Factory
4 Silo 1996 BPC Company Kuantan Design, Fabrication and Construct of Silos
5 Waste Sludge Incinerator Plant 1996 BPC Company Kuantan Design, Procurement, Fabricate, Construct and Commissioning of Waste Sludge Incinerator
6 Waste Heat Recovery Project 1997 TP Company Prai, Penang Procurement, Fabrication, Erection and Commissioning of Solid Waste Incinerator
7 4000 TCD Sugar Factory 1998 Lamson Sugar Company Hanoi. Vietnam Design, Procurement, Fabrication and Delivery of 12 sets of a total of 219.7 m length of Sugar Belt Conveyor
8 No.2 Waste Heat Recovery Project 2003/2004 TP Company Prai, Penang Procurement, Fabrication, Erection and Commissioning of Solid Waste Incinerator
9 Construct of Gas Holder for Sewage Treatment Plant 2005/2006 HPCW Company Kuala Lumpur Design, Pprocurement, Fabrication, Erection and Commissioning of 2 x 2500 m³ Dry Seal Gas Holder
10 Replacement of Quencher 2006 PetroChemical Singapore Ltd. Singapore Design, Fabricate, Erect of new quencher replacement for existing incinerator plant
11 YANSAB Project (Thermal Oxidizer) 2007 Tsukishima Kankyo Engineering Ltd. Kuala Lumpur Fabrication of Thermal Oxidizer, Scrubber, Quencher & Stack
12 Refractory Replacement 2007 MTBE (M) S/B Kuantan Replacement of refractory for the entire furnace unit
13 Replacement of Downcomer and Accessories in Incineration Plant 2008 Vinyl Chloride (M) S/B Kerteh, Terengganu Replacement of graphite downcomer tube, expansion joint and stuffing box for existing incinerator plant
14 Improvement of Existiing Plant Performance by replacing of Major Equipment on HCL Recovery Incineration Plant 2010/2011 Vinyl Chloride (M) S/B Kerteh, Terengganu New design and fabrication of burner unit, furnace, waste heat boiler, downcomer and etc.
15 Construction of Spherical Tank for Raw Chemical Gas Storage 2011/2012 TP Company Prai, Penang Design, Procurement, Fabrication, Erection and Commissioning of 4,000 m³ Pressurized Spherical Tank
16 Hazardous Waste Incineration Plant 2012/2014 Sarawak Waste Management S/B Kuching, Sarawak Design, Procurement, Fabricate, Erection and Commissioning of 60 ton / day Gasification Kiln Type Hazardous Waste Incineration Plant
17 Food Factory 2013/2014 AD Company Tg. Langsat, Johor Design, Procurement, Fabricate, Erection and commissioning of Margarine Sweetening Manufacturing Factory
18 Chemical Factory 2015/2016 TS Company Kemaman, Terengganu Design, Procurement, Fabricate, Erection and Commissioning of High Quality Zeolite Manufacturing Factory
19 Pressure Vessel for Filter 2015/2016 RP Chemicals (M) Kuantan, Pahang Procurement and Fabrication of Pressure Vessel for BOKELA Rotary Pressure Filter
20 Waste Water Treatment Plant 2017/2018 D Company Prai, Penang Design, Procurement, Fabricate, Erection and Commissioning of WWT Plant in Chemical Factory
21 Refractory Replacement work 2018 K Company Kuantan, Pahang Replacement of refractory for Combustor and Quencher, start up commissioning for the Incinerator
22 Refracory Maintenance work 2019 K Company Kuantan, Pahang Repair on refractory for Combustor and start up commissioning for the Incinerator
23 Incinerator Project, Indonesia 2019/2020 Tsukishima Kankyo Engineering Ltd. Indonesia Design, Procurement and Fabrication of Incinerator Pressure Vessel, Tanks and Heat Exchanger
24 2 Storey Warehouse Extension 2020 G Company Bukit Mertajam, Penang Design, Procurement, Erection and project management of 2 Storey Warehouse extension to existing factory